Block ip Trap
Primary Hydrogen Announces Definitive Agreement for Arthur Lake Property
Aug 06, 2025

Primary Hydrogen Announces Definitive Agreement for Arthur Lake Property

Primary Hydrogen Corp. (TSXV: HDRO) (FSE: 83W0) (OTCQB: HNATF) ("Primary" or the "Company") announces that it has entered into a definitive agreement dated August 5, 2025 (the "Definitive Agreement") with J4 Ventures Inc. ("J4"), a TSXV-listed capital pool company, for the sale of a 100% interest in the Arthur Lake Property (the "Property") located in British Columbia.

Pursuant to the terms of the Definitive Agreement, J4 will acquire the Property by issuing to Primary Hydrogen (i) 500,000 common shares of J4 and (ii) a cash payment of C$50,000, both payable on closing. Primary Hydrogen will also retain a 2% net smelter return (NSR) royalty on the Property.

Closing of the transaction is subject to customary conditions, including but not limited to:

  • Completion of a National Instrument 43-101 compliant technical report on the Arthur Lake Property acceptable to the TSX Venture Exchange (the "TSXV");
  • Completion of a minimum C$600,000 financing by J4;
  • Completion of satisfactory due diligence by both parties;
  • Receipt of all required regulatory and third-party approvals; and
  • Acceptance of the transaction by the TSXV.

There can be no assurance that the transaction will be completed as proposed or at all. The transaction is arm's length and is not expected to require shareholder approval by J4. If completed, J4 is expected to be listed as a Tier 2 mining issuer on the TSXV.

Primary Hydrogen | primaryh2.com

PowerBank (SUUN) Begins Installation of First Battery Energy Storage System in Ontario
Aug 06, 2025

PowerBank (SUUN) Begins Installation of First Battery Energy Storage System in Ontario

PowerBank Corporation (NASDAQ: SUUN) (Cboe CA: SUNN) (FSE: 103), a leading North American energy infrastructure developer and asset owner, proudly announces the installation of its cutting-edge 4.99 MW Battery Energy Storage System (BESS) in Cramahe, Ontario, at the project known as SFF-06.

hanging battery

This milestone marks PowerBank's bold entry into the rapidly growing battery storage market. The first five of nine EVLO Battery Containers are now on-site, supporting progress toward a sustainable energy future.

Strategic Financing, Acquisition, and Market Opportunity. The SFF-06 project, alongside a second initiative (903), is backed by a robust $25.8 million loan from Royal Bank of Canada (RBC), serving as Lender, Administrative and Collateral Agent, and Green Loan Structuring Agent. This financial partnership underscores PowerBank's commitment to innovative, eco-conscious energy solutions.

SFF-06 is owned by 1000234763 Ontario Inc. (ProjectCo), in which PowerBank holds a 50% stake, with the remaining 50% owned by a partnership of First Nations communities in Ontario.

Acquired through PowerBank's $45 million valued acquisition of Solar Flow-Through Funds Ltd. in July 2024, this project positions the company in a battery storage market projected to increase to $31.2 billion by 2029, growing at a 16.3% CAGR, according to Fortune Business Insights.

Expert Partnership. PowerBank has tapped Anvil Crawler Development Corp., part of the esteemed Skyline Group of Companies, to handle civil and electrical work. With a $1.85 million contract, Anvil Crawler brings its expertise to ensure seamless project execution.

Long-Term Value with IESO Contract. In July 2023, SFF-06 secured a 22-year contract through the Independent Electricity System Operator's (IESO) Expedited Long-Term RFP (E-LT1 RFP). With a fixed capacity payment of $1,221/MW per business day—well above the $876/MW average for storage projects—this contract ensures strong financial returns.

Once operational, SFF-06 will deliver 4.74 MW of daily contract capacity for 251 business days annually, powering Ontario's grid with reliable, clean energy.

Clean Tech Incentives. The project qualifies for the 2024 Clean Technology Investment Tax Credit, offering up to 30% reimbursement of eligible capital costs. This refundable credit enhances SFF-06's financial performance while aligning with PowerBank's mission to accelerate renewable energy adoption through strategic government incentives.

PowerBank's SFF-06 project is a significant development for Ontario's energy landscape, blending cutting-edge technology, strategic partnerships, and sustainable investment to drive the clean energy revolution forward.

Project Risks. There are several risks associated with the development of the Project. The development of any project is subject to required permits, the continued availability of third-party financing arrangements for the Company, the risks associated with the construction of a battery energy storage project and the degradation of battery storage capacity over time based on the number of discharge cycles. In addition, governments may revise, reduce or eliminate incentives and policy support schemes for battery energy storage, which could result in future projects no longer being economic. Please refer to "Forward-Looking Statements" for additional discussion of the assumptions and risk factors associated with the projects and statements made in this press release.

As previously disclosed, the 903 project remains in the permitting process and commencement of construction remains subject to the receipt of final permits. In particular, in order to proceed with construction of the 903 project an Official Plan Amendment and Zoning By-law Amendment ("OPA/ZBA") are required from the Town of Armour, Ontario. On November 8, 2022 the ProjectCo -1000234763 Ontario Inc received a Municipal Support Resolution, which was unanimously approved by the council for the Town of Armour. However, the OPA/ZBA have been delayed as a result of certain public opposition and the council's evaluation of how to respond to such opposition. A delay in obtaining the necessary OPA/ZBA means that ProjectCo may not be able to commence construction on the originally planned timeline and delaying construction means that achieving commercial operation on or before April 2026 will be delayed. In order to extend the deadline for commercial operation under the E-LT1 contract for the project, ProjectCo has sent the IESO a notice of potential force majeure event to the OPA/ZBA delay. The timing of the issuance of the OPA/ZBA and its impact on project schedule remains uncertain. The permitting delays have delayed certain payments due to Evlo for the battery energy storage system for the 903 project and OZ-1 project (which is also undergoing permitting). Evlo and the Company are negotiating an accommodation on the payment deadlines, but there is no certainty on the outcome of such negotiations.

PowerBank Corporation | www.powerbankcorp.com

 

Robroy Industries Enclosures Division Welcomes Michael Nielson as Sales Operations Manager
Aug 06, 2025

Robroy Industries Enclosures Division Welcomes Michael Nielson as Sales Operations Manager

Robroy Industries Enclosures Division is proud to announce the appointment of Michael Nielson as Sales Operations Manager, a strategic role focused on transforming and optimizing the company’s sales organization for scalable growth.

In this role, Mike will lead initiatives to enhance sales efficiency, implement strategic processes, and foster greater alignment across departments and the enterprise. His leadership will play a vital role in positioning the Enclosures Division for long-term success through data-driven decision-making and operational excellence.

Appointing Mike is a significant milestone in our pursuit of a more agile and high-performing sales organization,” said Craig Mitchell, President of Robroy industries Enclosures Division. “His proven expertise in sales leadership, combined with his engineering background, makes him uniquely qualified to drive strategic growth in this role."

Mike brings over two decades of professional sales experience to Robroy Industries, during which he consistently delivered exceptional results in sales strategy, operation management, and business development. His background includes leading cross-functional teams, executing enterprise-level transformation initiatives, and optimizing sales operations to support growth and customer satisfaction.

Robroy Industries | www.robroy.com

Origis Energy and Pioneer Community Energy Announce 20-Year Solar + Battery Storage Agreement
Aug 06, 2025

Origis Energy and Pioneer Community Energy Announce 20-Year Solar + Battery Storage Agreement

Origis Energy, one of America’s leading renewable energy and decarbonization solution platforms, and Pioneer Community Energy (Pioneer), a not-for-profit electricity provider headquartered in Rocklin, California, announced the signing of a 20-year agreement for the Chalan Solar + Storage project in Lost Hills, Kern County, California. Origis Energy will develop, construct and operate the 65 MWac Solar + 25 MW (100 MWh) battery energy storage system facility, selling the power to Pioneer to help fuel its growth. Chalan is slated for commercial operation in 2026.

“Our partnership with Origis Energy comes at a very opportune time. As Pioneer plans to expand our service territory into 13 new territories, this agreement ensures that we can provide clean energy and increased storage that helps meet renewable energy and sustainability targets while meeting the load requirements for our new customers,” said Vice Chair of Pioneer’s Board of Directors and Rocklin City Councilmember Greg Janda.

“We are pleased to partner with Pioneer and we look forward to delivering them solar and storage solutions as they execute on their expansion plans. For Origis, this partnership also represents an important step forward in our mission and strategy to deliver cost-effective electricity to customers across the U.S.” said Vikas Anand, Chief Executive Officer of Origis Energy.

Pioneer Community Energy | www.pioneercommunityenergy.org 

Origis Energy | www.origisenergy.com/project/chalan-solar-storage/

 

Brad Wasley Named President of PMC Industries/AceClamp
Aug 06, 2025

Brad Wasley Named President of PMC Industries/AceClamp

Brad WasleyBrad Wasley, a fourth-generation member of our founding family, has contributed more than 30 years of dedicated service in various roles spanning manufacturing, facilities management, sales, and quality assurance across a diverse range of industries. We are proud to announce that effective immediately, Brad has been promoted to President of PMC Industries/AceClamp. Brad’s depth of experience and commitment to innovation will continue to be instrumental in PMC’s success.

PMC Industries/AceClamp | https://www.aceclamp.com/

The Graphene Battery Era Begins: Volexion Delivers Graphene‑Coated Cathode Materials to Leading Manufacturers Across the Global Battery Ecosystem
Aug 06, 2025

The Graphene Battery Era Begins: Volexion Delivers Graphene‑Coated Cathode Materials to Leading Manufacturers Across the Global Battery Ecosystem

Volexion, a battery materials company supercharging lithium‑ion performance with graphene‑coated cathode active materials (CAM), announced it has shipped its first product samples to tier‑one manufacturers worldwide. Initial recipients include leading automotive OEMs, top global cell producers, and U.S. specialty energy‑storage developers, with additional shipments already underway.

Why It Matters

Inside every battery, cathode active materials are in constant motion. Ions shuttle back and forth, particles expand and contract, and surfaces react with electrolytes. Over time, like moving parts in any machine, that natural interaction degrades performance.

Volexion’s graphene coating protects CAMs from this degradation, enabling batteries that last longer, charge faster, and deliver higher energy density, without retooling factories or disrupting supply chains. The technology works across established and emerging chemistries, including NMC, LFP, lithium-manganese-rich (LMR), LMFP, and LNMO, ultimately bringing graphene’s long-promised benefits to scale.

“Every lithium‑ion battery is fighting a slow battle against its own chemistry; cathode materials wear down as they work,” said Joseph X. Adiletta, CEO of Volexion. “Our graphene coating shields those materials from that breakdown. It’s a drop‑in solution that extends life, boosts performance, and enables next‑generation chemistries without costly retooling.”

Close to a dozen early adopters across the supply chain are already evaluating early shipments. This list includes global materials producers, cell developers, and OEMs, among others. Volexion will partner with customers to apply the coatings, ultimately shipping larger quantities of graphene for scaled deployment over the next several years, according to customer timelines. Volexion uses commercially available off-the-shelf equipment, streamlining and de-risking scalability.

“This is a crucial milestone in our scale‑up journey,” said Damien Despinoy, Volexion's president and chief operating officer. “Our customers’ increasing demand for scalable solutions for current and next-generation battery problems has driven deliveries across geographies, chemistries, and applications. This is just the beginning — and, with an easily scaled solution, we are ready to go.”

Volexion’s graphene encapsulation platform is chemistry‑agnostic and manufacturing‑compatible, positioning it as a critical enabler for the next era of battery innovation, from electric vehicles to portable electronics, grid storage to data centers, and drones to defense.

Volexion | www.volexion-inc.com

TGS Supports Equinor’s Empire Wind Project with Data Management Solution
Aug 06, 2025

TGS Supports Equinor’s Empire Wind Project with Data Management Solution

TGS, a global leader in energy data and intelligence, is pleased to continue its collaboration with Equinor by providing the Prediktor Data Gateway solution for the Empire Wind offshore wind project. This contract underscores TGS’ commitment to delivering strong digital solutions that enhance operational efficiency and data security in renewable energy.  

Empire Wind 1, located off the coast of New York, in the U.S., will have a total installed capacity of 810 MW, providing clean energy to approximately 500,000 homes. To support this large-scale development, Prediktor Data Gateway will deliver data management services to support standardisation, security and efficient handling of data. 
  
Already deployed in major offshore wind projects such as Dogger Bank, Prediktor Data Gateway enables seamless data integration across assets, streamlining operations and maintenance (O&M) applications while allowing operators to scale their digital infrastructure efficiently. 

Will Ashby, Executive Vice President of New Energy Solutions at TGS, stated “Our continued deliveries to Equinor highlights the growing importance of digital solutions in optimizing offshore wind operations. As the offshore wind sector continues to expand, reliable and secure data management remains essential for optimizing performance and maximizing asset and production value. Through cutting-edge digitalization solutions, TGS is at the forefront of supporting the global energy needs.” 

To learn more about Prediktor Data Gateway or speak to a specialist, visit: https://www.tgs.com/digital/data-gateway   

TGS | www.tgs.com 

Alternative Energies Jul 31, 2025

Smart Buildings: Why investing in upgrades pays off

As energy costs rise and climate mandates tighten, building owners face mounting pressure to cut energy use and carbon emissions. With buildings accounting for about 30 percent of global energy demand, even small improvements can have a major im....

The Ultimate Renewable Battery: Controlled liquid hydrogen storage
Alternative Energies Jul 15, 2025
5 min read

The Ultimate Renewable Battery: Controlled liquid hydrogen storage

As the world rapidly electrifies, the demand for clean, scalable, and cost-effective energy storage is skyrocketing. While renewable energy sources...

Greg Gosnell

Rent vs Buy: Best fleet management choice for your wind project
Wind Jul 15, 2025
5 min read

Rent vs Buy: Best fleet management choice for your wind project

When it comes to capital expenditure considerations, many fleet managers wrestle with determining when to rent equipment versus when to...

Chris Keys

When the Cows Escaped: A day in the life of a wind energy parts sales engineer
Wind Jul 15, 2025
4 min read

When the Cows Escaped: A day in the life of a wind energy parts sales engineer

Many people believe the life of a traveling salesperson is glamorous: jet-setting around, seeing the sights, and dining at fancy...

William “Bud” Frabell

Jul 15, 2025
The Solar Product Registry Set to Boost Solar Deployment

The urgent need to accelerate solar installations across the United States stands at the forefront of the nation's commitment to significantly decarbonize the energy grid in the fight against climate change. Achieving this ambitious target necessitat....

Solar Jul 15, 2025
6 min read
Evolving in a Time of Change: Next Steps for Massachusetts “SMART”

The Massachusetts legislature enacted the innovative “Solar Massachusetts Renewable Target” program (SMART) in 2016 to support use and development of solar photovoltaic (PV) generating units by residential, commercial, governmental, and indu....

Robert J. Munnelly, Jr.

Solar Jul 15, 2025
5 min read
Empowering U.S. Homes and Small Businesses

In recent years, increasing climate volatility has had a significant impact globally. The United States has also experienced a range of natural disasters, including frequent solar flares and cyclones. In response, there has been a growing emphasis on....

Dhirendra Mishra

Aug 06, 2025

Origis Energy and Pioneer Community Energy Announce 20-Year Solar + Battery Storage Agreement

Aug 06, 2025

Brad Wasley Named President of PMC Industries/AceClamp

Aug 06, 2025

Black & Veatch Powers the Philippines’ First Megawatt-scale Floating Solar Facility

Aug 06, 2025

Arevon Reaches Full Operations at its $2 Billion Eland Solar-plus-Storage Project in California

Aug 05, 2025

EPA Preparing to End Solar for All Program, Threatening Energy Access and Economy

Aug 05, 2025

Dominion Energy Virginia Announces New Solar Array at Richmond Flying Squirrels’ Future CarMax Park Stadium

Aug 05, 2025

OMCO Solar Now Offering 100% Domestic Solar Tracker Solutions

Aug 05, 2025

ARRAY Technologies to Supply 100% Domestic Content Solar Trackers for 200MW Indiana Solar Project

Jul 15, 2025
Keeping EV Fleets Running in Emergencies

In little more than a decade, driving an electric vehicle (EV) has gone from being a statement made by environmentally conscious drivers to a real trend fueled by advances in technology, range, reliability, and convenience. The rise in EV adoption ha....

Energy Storage Jul 15, 2025
5 min read
Tariffs Strain BESS Operators

As the global energy transition accelerates, battery energy storage systems (BESS) have become essential to grid flexibility, helping to balance intermittent renewable resources and ensure reliability. However, as storage installations age, battery d....

Lennart Hinrichs

Energy Storage Jul 15, 2025
5 min read
In 2025, Two Massive Opportunities Await Forward-Thinking Utilities

The energy industry is in the midst of massive change, exacerbated by a new administration and an alarming increase in demand that has characterized the past few years. Many industry experts are closely watching the Trump administration’s rhetoric,....

Vincent Ambrose

Aug 06, 2025

PowerBank (SUUN) Begins Installation of First Battery Energy Storage System in Ontario

Aug 06, 2025

The Graphene Battery Era Begins: Volexion Delivers Graphene‑Coated Cathode Materials to Leading Manufacturers Across the Global Battery Ecosystem

Aug 06, 2025

Carbon DC Acquires Elywhere North America to Accelerate North American DC Grid Deployments for Commercial Real Estate

Aug 06, 2025

Calibrant Energizes Three Front-of-the-Meter Battery Storage Systems in New York, Unlocking Grid Relief and Corporate Value

Aug 06, 2025

Everged Accelerates EV Charging Expansion with i-charging's Advanced DCFC Technology

Aug 06, 2025

The U.S. Battery Circular Economy Advances with PNE's South Carolina Flagship Recycling Facility

Aug 05, 2025

Fortress Power Launches Industry-Leading 15-Year Warranty for eForce Energy Storage System

Aug 05, 2025

Eagle Point Closes $18 Million Project Financing for Cross Trails Battery Energy Storage System (BESS), Supporting Grid Resiliency in Texas

Jul 31, 2025
Smart Buildings: Why investing in upgrades pays off

As energy costs rise and climate mandates tighten, building owners face mounting pressure to cut energy use and carbon emissions. With buildings accounting for about 30 percent of global energy demand, even small improvements can have a major im....

Alternative Energies Jul 15, 2025
5 min read
The Ultimate Renewable Battery: Controlled liquid hydrogen storage

As the world rapidly electrifies, the demand for clean, scalable, and cost-effective energy storage is skyrocketing. While renewable energy sources like solar and wind offer an abundant and sustainable supply of power, much of their potential remains....

Greg Gosnell

Alternative Energies Jul 15, 2025
5 min read
Breaking Down the “One Big Beautiful Bill”

On May 22, 2025, the U.S. House of Representatives passed the One Big Beautiful Bill Act (OBBBA) by a narrow margin of 215–214, with one member voting present. The OBBBA proposes significant amendments to the Inflation Reduction Act (IRA) of 2022, ....

Cole Jiaras

Aug 06, 2025

Primary Hydrogen Announces Definitive Agreement for Arthur Lake Property

Aug 06, 2025

Robroy Industries Enclosures Division Welcomes Michael Nielson as Sales Operations Manager

Aug 06, 2025

Gridmatic Launches AI Load Optimizer to Help Large Energy Users Capture More Value from ERCOT Markets

Aug 05, 2025

American Enrichment Company General Matter Signs Landmark Lease with Department of Energy to Bring Uranium Enrichment Back to Paducah, the Industrial Atomic City

Aug 05, 2025

Exus Renewables North America Launches ExusIQ+ Performance Optimization Suite with Debut of Pitch Power+ Tool

Aug 05, 2025

Sharper Shape Launches LiDAR Insights: Revolutionizing LiDAR Classification with AI-Powered Efficiency

Aug 04, 2025

Grid8 Launches Free Interconnection Dashboard to Unlock Faster, Smarter Grid Access for Data Centers and Renewable Developers

Aug 01, 2025

nVent Delivers Record Sales, Orders and Backlog in Q2 2025